Plumbing required for en-suite. Plumb shower mixer, hot/cold supplies for vanity, cold supply for toilet, plumb wastes for toilet, shower and vanity. Also correct some existing water supplies for better performance. Easy access to under floor from basement below. Walls are also currently open prior to lining. Scaffolding currently in place outside. Existing toilet vent pipe is cast iron and close by on outside wall.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very competent and easy to work with
Work carried out by the owner/operator
Reviewed on 08-11-2020
#1 | Tradie 1 |
|
49 jobs | Secured job |
#2 | Tradie 2 |
|
97 jobs | No longer in contact |
#3 | Tradie 3 |
|
43 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 42 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 77 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 13 jobs | No longer in contact |
#7 | Tradie 7 |
|
128 jobs | No longer in contact |
#8 | Tradie 8 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work