bathroom needs renovation. move the toilet, put a bath in. there is only a shover at the moment. I'd like to get it done in the next 3 weeks. thanks
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
2.0
|
Communications |
3.5
|
Bathroom looks great. I would go in to more details before going ahead with the job. A big chunk of the cost was left out of the quote by mistake. Also, it took much longer than planned. Overall, happy with the way our bathroom looks.
Work carried out by the owner & subcontractors
Reviewed on 01-10-2013