*Have two joined 2000L storm water attenuation tanks. Require the attachment of one simple water level sight indicator and a tap to assembly. *Have a F&P fridge that has an ice and cold water dispenser build in. Requires water supply to be attached to fridge. Manufacturers plumbing came with fridge.
#1 | Tradie 1 |
|
79 jobs | No longer in contact |
#2 | Tradie 2 |
|
120 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work