Need above sink taps lowered below sink and wingbacks put on. Copper pipes and the cold water comes up vertically, but the hot water comes in horizontally. Also need the waste to be plumbed into the new sink.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work and was very helpful
Work carried out by the owner/operator
Reviewed on 13-07-2018
Partner with Builderscrack
Get work