Please find attached plans for the four storey dwelling at 4A Ada St. Please note that it will be on mains gas water heating. Please find timeline for the project below: a) GF – below floor plumbing – --- b) First Floor – plumbing for floor slab– --- c) Second Floor – Plumbing for floor slab - --- d) Third Floor – Plumbing for floor slab – --- Following this, the internal fit out will be commencing simultaneously as the work progresses. Please advise if you are available for this job and provide a fee proposal for full job which will include all workmanship, internal pipes and fittings. The fixtures such as toilets, basins, showers will be provided by the owner and installed by you.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
83 jobs | No longer in contact |
#3 | Tradie 3 |
|
252 jobs | No longer in contact |