Where we are replacing tiles with a smaller stone splash back we need some plastering done to two areas that will be painted. We would be keen for this work to be done in the next 7 days before the new splash back arrives but we are flexible in this timing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 02-06-2022
Partner with Builderscrack
Get work