I have been caught in lockdown with no kitchen. Now we are going to level 3 I'm keen to get it completed. I have had a wall removed between my kitchen and hallway and that new opening, as well as a fridge alcove opening, need plastering. Also where the wall has been removed. This is in a 1930s art deco flat with mostly solid concrete walls. The wall removed wasn't solid concrete, so the opening is standard gib board. The soonest this can be done the better.
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
#3 | Tradie 3 |
|
16 jobs | No longer in contact |
#4 | Tradie 4 |
|
78 jobs | No longer in contact |
Partner with Builderscrack
Get work