Review

Finish off Kitchen Walls - Prep for Tiler

Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

Interior plastering
Wellington

My kitchen cabinetry was recently done, but there is panel hole in the top right corner left behind from old cabinets being ripped off, the new outlets being placed in the wall, and from where the taps/old benchtop was. The walls where the cabinet were ripped off also need to be tided up. The tilers can't start work until this is all tidied up, so looking to get it filled in/plastered over etc, so that my kitchen will look finished.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Excellent job done filling in the holes left behind from my kitchen install.

Work carried out by the owner/operator
Reviewed on 15-06-2021

Tradesperson reply
"Thanks Jo Great to see that kitchen renovation coming along. Cheers 👍"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo