Small repair job required to fix and stop and insulate approximately 5-6 sqm of new jib board plus minor plastering repairs to existing wallboard. See photo.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The fixing was done separately to the stopping and painting by different tradespersons both through Abel Decorators
Work carried out by a subcontractor
Reviewed on 23-03-2014
Tradesperson reply
"Thank you for the positive feedback."
#1 | Tradie 1 | No recent reviews | 17 jobs | Secured job |
#2 | Tradie 2 |
|
296 jobs | No longer in contact |
#3 | Tradie 3 |
|
88 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 13 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 10 jobs | No longer in contact |
Partner with Builderscrack
Get work