After rumpus ceiling patch to be gibbed was a leak from hot water cylinder where we had floor repaired and ceiling fans to dry out. Have 1 x piece of gib happy to have area cut and one sheet put up and plastered to get ready for paint. Area is roughly 1.4 x 1.6 long and wide
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ian was fast with contacting and providing all the information and communicated eachg step through out the process. Great job
Work carried out by the owner/operator
Reviewed on 26-02-2024
Partner with Builderscrack
Get work