Our downstairs lounge, bedrooms and reception area was damaged in the flood in Jan 2023, Insurance has been sorted and we are now ready to have the following done: - Door/wall - Framing. Clean, straighten - Insulation. Supply and install. R2.6, glasswool, strapping - Gib board, Standard, replace, linings 10mm - Stop plasterboard wall, Level 4, small, areas - Walls. Paint 3 coat system - Trim Pine 60x10mm Remove and replace - Trim. Fill & Paint trims to match existing - Door and frame. Remove and replace, hc, MDF - Door. Paint (includes frame and trim) We would like to get this started as soon as possible and are looking for quotes for this work.
#1 | Tradie 1 |
|
33 jobs | Requesting contact |
#2 | Tradie 2 |
|
510 jobs | No longer in contact |
#3 | Tradie 3 |
|
25 jobs | No longer in contact |
#4 | Tradie 4 |
|
92 jobs | No longer in contact |
#5 | Tradie 5 |
|
4 jobs | No longer in contact |
#6 | Tradie 6 |
|
77 jobs | No longer in contact |
#7 | Tradie 7 |
|
122 jobs | No longer in contact |
#8 | Tradie 8 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work