I have just had led lights put in, and there are now two smalls holes in the ceiling where the original lights were which I need filled as in the photos. I'm hoping to get the job done on either Friday 8th or Monday 11th june
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very happy with the end result, thank you
Work carried out by the owner/operator
Reviewed on 23-06-2018
Tradesperson reply
"Thanks very much David for all cooperation
Hope to hear from you in future
Cheers Sam"
Partner with Builderscrack
Get work