I have pulled my kitchen out, floor area circa 8m2, need to have the ceilings stopped and gib cove put up. Kitchen is 3.1 x 2.6, Gib cove same lengths but a step out on each 3.1m run. So joing to existing 75mm cove on two sides +2 external corners and 4 internal corners. Ceilings are 2.6m long x 2 new joins and 1 x joining to existing. Also need to stop the walls above bench height. gib will all be finished this sunday 28th June, kitchen booked in for the 30th so really only have one day (Monday) to get the cove up and a few coats on the GIB before the kitchen goes in on Tuesday... anyone keen?