Published on 25 March 2022
Immediate start, house is not occupied but owner there every day. Refurbished bathroom has new aqualine gib installed now. There is a large window in one wall (1st photo is before reno, others are with the new gib). There in an alcove shower which needs one 900 enclosing wall gib stopped. Gib needs to be sealed after, ready for paint and vinyl.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dennis did a lovely job in my rental. He was also punctual and very pleasant to deal with, and made some helpful suggestions. I have never before seen a stilt-walking plasterer, but he was amazing ! Much of the gib was covered with a vinyl walling, but the upper area was painted. Awesome job !
Work carried out by the owner/operator
Reviewed on 13 April 2022
Tradesperson reply
"Such a delightful person to work for which makes the job so much easier thanks for the work Rachel 🙂"
Partner with Builderscrack
Get work