We have an existing area that has had new wall framed up - there are three spaces, a single toilet, a hallway/milk vending machine area and an office. The area is fully lined and ready for plastering. The area has had flooring installed so floor protection would be required. We are eager to have this completed in the next few weeks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 29-06-2022
Partner with Builderscrack
Get work