Posted 3 years ago
Bathroom plastering
Interior plastering
Papamoa Beach, Tauranga
Required on 4th 5th or 6th August (must be complete by the 7th).
Papamoa East
Require Gib stopping with correct bathroom grade plaster for over Gib aqualine. plus plastering of Cement board in the Shower area. only lower level of GIB is being replaced, not Ceiling or upper walls.
Most of the area will be tiled over, up to 1.1m across all walls, so only the mid wall joins will be showing, so only needs to be level 5 for those joins not the rest of the area.
See photos of area that is being...