Published on 17 April 2024
we have closed in a double garage, and put in a couple of windows. the frontage is covered with concrete board and needs textured plaster to match other parts of the house. at the rear, there are two spots, easily accessible , where cracking had occurred and now needs replastering.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Craig was great to deal with. The scheduling issues were to do with unexpected illness rather then mismanagement. Fantastic job delivered.
Work carried out by the owner/operator
Reviewed on 14 June 2024