New gib work: 2 x bathrooms - both are walled tiled up to 1.2m. The remaining walls and ceiling are gib board. 1 x Toliet - walls and ceiling. 1 x laundry - walls and ceiling. 2 x additional walls - cavity slider and kitchen. Patchwork in other rooms: - Flue removed from the ceiling. - Ceiling strip in the living room where a wall was removed. - Arch removed from the hallway - Other patchwork where cracks and old mesh are failing Date to complete: During the week of the 25th of April (after the bathrooms have been grouted and the remaining gib has been put up).
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 04-05-2022