Stopping and painting internal renovations - four parts: 1) Skylight tunnel (600mm x 1700mm wide tunnel) and interface with internal ceiling. Finished with white ceiling paint. 2) Ceiling (only) of small bathroom 2700x2000mm (walls will be tiled so don't need stopping - ceiling only stopped and painted). Finished with white waterproof bathroom ceiling paint. 3) Around side of new bath (needing to be stopped for tile waterproofing by tiler - no painting needed). 4) Partial bedroom wall where there used to be a door. Finish with same white paint up to edges of existing wallpaper. See pics for more details.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work