I have just installed 13.5 sheets of 2.4m Gib Board. I need to have it stopped to a high finish in preparation for painting. There is also a small amount of stopping on the existing Gib Board to be done. I would like this to be done as soon as possible. Cheers.
#1 | Tradie 1 |
|
59 jobs | No longer in contact |
#2 | Tradie 2 |
|
66 jobs | No longer in contact |
#3 | Tradie 3 |
|
130 jobs | No longer in contact |
#4 | Tradie 4 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work