About to undergo a ceiling re-line and need Gib stopping of about 40m2 between two bedrooms. have the existing being removed and GIB being put up professionally already but I do not have a stopper. about 40m2 of low vaulted ceiling with two dormers (so are some corners and angles. These are low ceilings starting at about waist height so only small step required to reach the apex. Looking to have job completed between 23rd and 30th March 18.
#1 | Tradie 1 | Not reviewed | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work