Active job

Gib stopper required

Job image
Job image

Job description

Interior plastering
Papakura

Hi there, I am looking for a gib stopper to help us with two modular homes totaling around 90m2. The pods are currently under construction and will be ready in approx. 4-5 weeks time. I work off contractors providing m2 rates for the project. Please get in touch if interested. Plans are attached. Thanks J


Trade professionals

#1 Tradie 1
60 jobs No longer in contact
#2 Tradie 2
123 jobs No longer in contact
#3 Tradie 3
28 jobs No longer in contact
#4 Tradie 4
9 jobs No longer in contact
#5 Tradie 5
35 jobs No longer in contact
#6 Tradie 6
103 jobs No longer in contact
#7 Tradie 7
6 jobs No longer in contact
#8 Tradie 8
74 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo