We have had our house re-plumbed due to black pipes splitting. The replacement Gib has been installed and now needs to be plastered ready for painting. Four larger areas (approx. sizes --- ) and two small (less than --- ) need to be plastered. Work to be done as soon as possible after ANZAC Day.
Partner with Builderscrack
Get work