We have had a bunch of lights, light switches and powerpoints shifted and replaced. This means in the ceiling we 4 old light holes and 15 cut holes to be patched and plastered. In the walls we have 7 old switch holes, 4 holes and a grove routed in brick wall to be patched and plastered. Additional to this is a new wall that needs skimming. We would be wanting the work done on or after 4 June.
Partner with Builderscrack
Get work