Have a bathroom and toilet that needs plastering, ideally want the job started Friday if at all possible.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 13-11-2018
Partner with Builderscrack
Get work