Back steps are about 5 square metres with 1/3 of this new concrete and the remainder concrete covered in plaster. the existing plaster needs to be removed and new plaster installed across all the entranceway steps (new and old). *Cover/protection to areas required. *Rake out Existing Plaster. *Create key Coat. *Apply Scratch Coat. *Apply Final Coat. All labour and materials to be included
#1 | Tradie 1 | No recent reviews | 10 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 38 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 2 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work