The end wall of the double garage has the laundry area and a door. This is lined with gib but has never been plastered. Built approx mid '90s. It has had wear and tear reflecting this time frame. I would like to tidy this one area up by getting it plastered initially. Preferably within the next three weeks if possible.
#1 | Tradie 1 |
|
119 jobs | No longer in contact |
Partner with Builderscrack
Get work