I'm having the bathroom completely re-done at the moment. The new gib needs to be plastered before I paint it. The room is 2.7m by 1.7m. The sooner the job can be done, the better. Although I am flexible.
#1 | Tradie 1 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work