Some plaster has come loose and requires replacement . This is to be done prior to a repaint. The building is a small apartment building and is 3 storeys high. The building will be fully scaffolded. To fit in with painting schedule it should be done on the 15th to the 17th of January 2024.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 19-01-2024
Partner with Builderscrack
Get work