We have bathroom and bedroom to be done. For bathroom, beam bulkhead to be plastered, ready for painting. Holes in ceiling (fan and lights) to be plastered ready for painting. Edges of ceiling to be plastered ready for painting. Walls up to the ceiling will be tiled. For bedroom, walls extended to be plastered ready for painting which includes inside wardrobe and a small are in the hallway. GIB cove to be done in bedroom and small area in hallway.
Workmanship |
3.0
|
Cost |
2.0
|
Schedule |
2.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 04-04-2023
Partner with Builderscrack
Get work