Two storey house (120sqm) renovation. Approx 90% of house has new Gib board to be stopped. Remainder to be touched up. Slim line to be installed and Gib Cove throughout.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 23-05-2020
Partner with Builderscrack
Get work