Damage from March Earthquake EQC claim area of refurbishment (plastering): - Main Bedroom - vertical cracking to the wall covering and to the ceiling - Hallway - ceiling crack across join - Hallway - vertical cracking to the gib wall Painting too.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work