1.Small alteration on one wall needs to be filled and plastered. 2.Prep and paint one master bedroom. Paraparaumu Based. Already have paint.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Good workmanship, unfortunately room stank of body odour for 1 day after their visit.
Work carried out by the owner/operator
Reviewed on 04-11-2020
Tradesperson reply
"Thanks for the review. Unfortunately it was the heat gun to plaster aftereffect that caused the body odour smell. Cheers"
Partner with Builderscrack
Get work