We have two bedrooms, a hallway and a lounge to plaster after we install the new jib board this week. The area is approx 50sqm of floor space plus a 3.1m stud height. The ceiling will need doing as well. We'd like to get this done early January if possible.
Partner with Builderscrack
Get work