Gib board damaged on two adjacent sloping ceiling surfaces, due to studs popping. Needs repairing to a standard that will satisfy insurance/EQC assessors; see photo. Timeframe: reasonably soon.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very competent and professional.
Work carried out by the owner/operator
Reviewed on 18-07-2023
Partner with Builderscrack
Get work