Existing block wall to have the capping block pulled off, then raised by one 200mm block, then plastered (mostly 2 faces and top) with a rough cast type finish. Would like to have completed before end of January, preferably before Christmas
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very good service, finished early to allow the follow on trade to do their job. Also very happy with the quality job done
Work carried out by the owner/operator
Reviewed on 03-01-2023
#1 | Tradie 1 |
|
7 jobs | Secured job |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
41 jobs | No longer in contact |
#4 | Tradie 4 |
|
258 jobs | No longer in contact |
Partner with Builderscrack
Get work