Door area has been filled in and needs sanding and plastering on both sides of wall. Needs to be prepped for paint. It is behind the new logburner. I will remove the architrave prior. Wall lining is mdf and Lathe and plaster.Thanks.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fast, Punctual and cost effective, will use again, Thanks Vahid.
Work carried out by the owner/operator
Reviewed on 06-09-2022
Partner with Builderscrack
Get work