The job is ready for an immediate start, this is a 3-brm flat that has been re-levelled with some cracking to the lath and plaster. As well there is some new renovation work to be stopped plus a new gib ceiling to one bedroom as an overlay needs to be done, ie supply, fit and stop. The flat is vacant and ready for an immediate start. Really needs to be done within the next couple of weeks.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work