We removed a window unit and replaced with a door unit. The exterior plaster had to be cut back for installation. We now need the plaster patched between the door frame and the cut back plaster. This is required down both sides of the door (but not too and bottom).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Job went smoothly and as per schedule. Very pleased with the result. Highly recommended. It was priced as per quote which was high for a small job however understandably as it involved several trips (for drying time, etc).
Work carried out by the owner/operator
Reviewed on 18-11-2019
Partner with Builderscrack
Get work