We are renovating our laundry and bathroom and have completely ripped everything out and have added in another wall. The room is 2x2 (laundry) and bathroom is 6x2 both with a ceiling height of 2.45m. The gibing should be completed by the end of this week so require a plasterer to come in next week (w/c 8th July). Walls and ceiling will need doing and a small cupboard.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Steven did a great job and for a reasonable price. Stuck to schedule and cleaned up after himself. Thanks!
Work carried out by the owner/operator
Reviewed on 16-07-2019
Partner with Builderscrack
Get work