A bathroom in a 4 year old apartment has just been reconfigured and retiled. Unfortunately, the gib stopper was unable to complete the ceiling above the shower because of the tiler. He has put an initial coat to cover the cracks and holes, but it now needs a full sheet of "tape" over it and final plastering/sanding. The entire area is only approximately 1.5m x 0.8m. Paint finish required. Client wants to paint ASAP.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic service, excellent work. Couldn’t ask for better
Work carried out by the owner/operator
Reviewed on 22-05-2019
Partner with Builderscrack
Get work