Review

Gib stopping- 6sqm bathroom

Job description

Interior plastering
Christchurch

We have already started on the gib stopping- well the builder did. All major joins/ holes are done, but we're just not sure where we go from here. There's probably a little bit of stopping to be done and then sanding. Ceiling doesn't need anything- just the walls. We have all the materials here- we just need you to do the final preparation for painting. 6sq m Bathroom. We already have our painter organised, so please no painters.


Review

Workmanship
4.0
Cost
5.0
Schedule
5.0
Communications
4.5

Did an excellent job of the stopping and sanding however, I would have liked to have had a drop sheet used given that we've just remodeled the bathroom. All in all a good job though. One small patch up still to be completed after we get the first coat of paint on. :)

Work carried out by the owner/operator
Reviewed on 24-04-2011

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo