Published on 28 February 2024
2 existing pillars (polystyrene, plastered?) need to have about 10 cms repaired/added at bottom of pillar that is on top of balustrading.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 3 April 2024
Partner with Builderscrack
Get work