Review

Plaster basement walls - new jib joins old jib after flood damage,

Job image
Job image
Job image
Job image
Job image

Job description

Interior plastering
Auckland

In a small basement there are 4 rooms plus a hallway (38m2) that need plastering. The jib was removed halfway up the wall and replaced after flood damage in Jan. We would also like an entranceway (with no door) to the lounge plastered again as a very rough job was done by a home handyman. We will be ready for the plasterer by 8th August 2023.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Charles has an excellent commitment to customer satisfaction and ensured that our job was done to a high standard. We are very happy with the work his team have done for us. All the best with your business and if we need other things done we'll reach out.

Work carried out by a subcontractor
Reviewed on 27-08-2023

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo