I'm not sure if I should list this as tiling or as plasterboard work. In the bathroom there is an area of about 1 square metre where the plasterboard behind the tiles has disintegrated. I think what needs to happen is that the tiles need to be removed at the plasterboard replaced, but I'm not completely sure. There is one other small area which might also be affected. I su
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 17-04-2017
Tradesperson reply
"I'm very happy with that! I will work on my schedule in future.
Thank you for your reviews
Cheers Shaun "
Partner with Builderscrack
Get work