I have a small basement room which had flood damage earlier this year. Had to rip out gib with mould to half way up the wall, and let the block wall dry out. I've since painted the block wall with epoxy to limit water incursion in future. We need aqualine gib installed, skirting reattached, plastering, and the room painted. Work will be covered by insurance.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent and quick communication through out.
Work carried out by the owner/operator
Reviewed on 28-09-2023
Partner with Builderscrack
Get work