Alterations are being made at the property, we are creating a hallway, reconfiguring some wardrobes (2) to achieve this. We require a gibstopper too: 1. Gibstop the hallway, once the builder has installed the gib board. (approx 3m of hallway) 2. Gibstop where doors are being removed, where plasterboard is installed to fill these openings. (2 wardrobe doors, 1 internal door) We anticipate that the tradie will have the walls ready to paint, ie sanding will be completed also. We take possession of the property on 25 September and anticipate that we will require the work to be done on 29/30 September. Looking for cost estimates please.