We have a new kitchen being installed on about May --- . We need the existing walls prepared for the install. Currently the linings are a mix of hardboard and wood paneling. It may be possible to install plasterboard over the existing hardboard, rather than removing it. Ceiling cove would need to replaced. And some minor framing work may be needed. We would ideally be looking for the work to be carried out between April 6-16th.