New Gib board has been installed in Toilet and Laundry. i require gib stopping to be completed to paint grade finish as soon as possible. Stud height is 2.4m and total wall length for both rooms is 15.2m.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Chelsea if a very conscientous worker and very pleasant to deal with.
Work carried out by the owner/operator
Reviewed on 18-05-2019
Partner with Builderscrack
Get work