My lounge ceiling is about 20 SQM max. Need to remove and dispose existing plaster and install plasterboard. Prepare with gib stopping and skimming, ready to paint.Leave the room tidy when finished. Ceiling is three meter high from the floor.
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
45 jobs | No longer in contact |
Partner with Builderscrack
Get work